Communication is not 'keeping people informed.' It is getting a specific audience to understand a specific thing, through a channel they will actually use, in time to change what they do. Everything else is noise with a friendly tone.
Audience first, then channel
Start with who must do or decide something, and what they need in order to do it. A sponsor needs the decision, the options, and the cost of delay. A team needs the constraint and the next increment of work. An operational owner needs the date they inherit the thing. One email that tries to serve all three will serve none.
Match the channel to the job. Urgent, ambiguous, or emotional work wants a conversation — call, huddle, walk. Stable status and a record want writing. Complex trade-offs want a short live session with a pre-read. Putting a sensitive headcount issue in a group chat is not transparency. It is a future incident.
Push versus pull. Push when they must see it (a decision due Friday). Pull when it is reference (the plan, the register). If everything is push, people mute you. If everything is pull, they will swear they were never told. Design both, and say where the source of truth lives.
Say the point, then the evidence
Lead with the sentence that matters: 'We need a decision by Thursday: slip two weeks or drop the reporting module.' Then the two facts that make it true. Then the ask. People who write the history first and the ask in paragraph six are writing a diary. Diaries do not get replies.
Use their language, not your methodology. 'The sprint is amber because velocity dropped' is your dialect. 'The May release will miss unless we cut scope or add a tester' is theirs. Translate. If they have to decode you, they will wait for the meeting they can skip.
Close the loop. Communication that does not check understanding is broadcasting. For material messages, ask them to play back the decision or the date. It feels pedantic for ten seconds and saves a month of 'I thought you meant.'
Reduce noise on purpose
Agree a cadence so people stop asking 'any update?' Weekly written status, a fortnightly steerco, a daily team huddle — pick what the work needs, then stop inventing extra forums because someone was anxious on a Tuesday.
Name a single place for decisions. Chat is for speed. The log is for truth. If decisions live in six threads, you do not have communication. You have archaeology. When you decide live, write the decision before you stand up.
Watch your own volume. A PM who sends four 'quick notes' a day trains people to wait for the fifth. Batch the non-urgent. Escalate the actually urgent. If everything is flagged important, nothing is.
Summary & next steps
Pick the audience and the job, then the channel. Lead with the point and the ask. Push what must be seen, pull the rest, and keep one place for decisions.
Next: running meetings — the live version of this discipline, where an hour can either produce a decision or produce another meeting.